Showing posts with label plumbing. Show all posts
Showing posts with label plumbing. Show all posts

Friday, July 03, 2009

Wait for it....

OK, admittedly it has been a little while since our last post but things are beginning to happen. With the work of a new water main being put in (or upstairs bathroom remodel caused us to need one according to the city) we have started to work on 108 again. (photo below) Phase 1 continued. First insulation was put into the remaining upstairs walls. (photo right) Now patching those holes and preparing for painting. I did purchase a infrared paint stripper though.

Saturday, March 29, 2008

On to the future Kids bathroom

I will post some 'moved into' pictures of the master bedroom but right now it has a lived in look. So moving onto the kids bathroom.

Here is the beginning of the work taken last summer with a trench in the middle of the room for our new plumbing. On the opposite wall studs and plumbing go in for our laundry. And of course we needed the "little inspector" to make sure that everything was up to standards. Up next, the vanity's and bathtub go in.

Saturday, October 27, 2007

We're still here

The House (phase 1) is almost complete - I would post photos but we have been kinda lazy and not downloaded the photos yet and my wife has the camera with her at a scrap booking weekend. The home equity loan is also almost complete, but as you will see in near future posts with pictures it is well worth it. The plumbing is almost complete, electrical has a few goofs which are going to be corrected and now its our turn. We (and by we I mean Katie) has to scrap a lot of wall paper off, fix some cracks, prime and paint. Whoa. That is a lot of work she has a head of herself. Anyway, we will keep you posted.