
So moving right along - some chipping and wallpaper removal with a pinch of plastering.


We try to keep track of each stage but we missed a few points. Getting the wallpaper off in the Master Bedroom was rough. There aren't a lot of shots of the process because we were just happy to get it done. The picture of the cabinet is the one that used to be in the 2nd floor kitchen (now the Kids Bathroom). It will be well used in Katie's Craft Room.